Sound barrier will be placed between the Roosevelt Cemetery property and U.S. 1 SB, Ramp AB, and Ramp B, and between the Faulkner property and the Roosevelt Cemetery property.
During the ongoing final design process, the RC2 and RC3 corridors are being evaluated for noise mitigation, including sound barriers. At locations where sound mitigation is called for, PennDOT will hold special purpose meetings to present those plans and gather feedback from affected residents who will be notified by mail of the meetings.